The third leg of Rand Water’s planned maintenance on their systems is scheduled totakeplace from 6 January 2026 at 04:00 until 8 January 2026 at 08:00.
This 54-hour maintenance will be undertaken to replace certain isolation meter in theRandbulk supply pipes. During this time, affected Johannesburg Water systems will declineuntil empty, which will result in poor pressure to no water. Direct feeds will be affectedbynowater for the duration.